As a rule, after reclassification the vessel is assigned a “lower” Ice class than previous one of the foreign classification society. In this case and subject the ship owners request, a calculated analysis of the Ice class compliance with rules of RMRS is performed and a list of measures necessary for the Ice class “increase” is determined. To find out the Ice class which can be assigned to Your vessel after reclassification, use the tables below.
РС | УТ МАКО | CASPR | FSR | LR | DNV | ABS | |
Russia | — | Canada | Finland, Sweden | England | Norway | USA | |
Arc9 | PC 1 | CAC1 | Ice Class AC3 | POLAR-30 | A5 | ||
POLAR-20 | |||||||
CAC2 | Ice Class AC2 | POLAR-10 | A4 | ||||
PC 2 | CAC3 | Ice Class AC1.5 | A3 | ||||
Arc8 | |||||||
PC 3 | CAC4 | Ice Class AC1 | ICE-15 | A2 | |||
Arc7 | ICE-10 | ||||||
PC 4 | ICE-05 | A1 | |||||
Arc6 | |||||||
PC 5 | |||||||
Arc5 | IA Super | A0 | |||||
PC 6 | |||||||
Arc4 | B0 | ||||||
PC 7 | IA | C0 | |||||
Ice3 | IB | D0 | |||||
Ice2 | IC | ||||||
Ice1 | II |
РС | РС | РС | GL | BV | RINA | NK |
Before 1999 | 1999 — 2005 | Beginning with 2007 | 1996 — 2002 | Before 2000 | Before 2000 | 1997 — 2002 |
ЛЛ1 | ЛЛ9 | Icebreaker9 | Arc4 | |||
ЛЛ2 | ЛЛ8 | Icebreaker8 | Arc3 | |||
ЛЛ3 | ЛЛ7 | Icebreaker7 | Arc2 | |||
ЛЛ4 | ЛЛ6 | Icebreaker6 | Arc1 | |||
— | ЛУ9 | Arc9 | — | — | — | — |
— | ЛУ8 | Arc8 | — | — | — | — |
УЛА | ЛУ7 | Arc7 | — | — | — | — |
— | ЛУ6 | Arc6 | — | — | — | — |
УЛ | ЛУ5 | Arc5 | E4 | Ice I super | Ice Class IAS | Class IA Super IS |
Л1 | ЛУ4 | Arc4 | E3 | Ice I | Ice Class IA | Class IA IS |
Л2 | ЛУ3 | Ice3 | E2 | Ice II | Ice Class IB | Class IB IS |
Л3 | ЛУ2 | Ice2 | E1 | Ice III | Ice Class IC | Class IC IS |
Л4 | ЛУ1 | Ice1 | E | Ice Class ID | Ice Class ID | Class ID IS |
Additionally LLC “VITKO” offers the service of “increasing (improving)” the existing Ice class RMRS during reclassification of the vessel. This work includes development of the project for the vessel modernization with detailed description of measures for the hull and propeller-steering complex retrofitting. All stages of the project development are agreed (coordinated by, approved by) with the shipowner, taking into consideration (considering) the technical equipment of the vessel and necessary means and materials for the project realization.
Required source documentation (download)